Asbestos and Other Regulated Building Materials
Building materials can contain a number of hazardous components that, if disturbed, can pose a health risk to workers and occupants.
Regulated building materials pose no health risk when left alone...
Basic Electrical Safety
We rely on electricity, but sometimes underestimate its capability of causing injury. Even household current (120 volts) can stop your heart. UW personnel need to be aware of the hazards...
Hazardous Energy Control - Lockout/Tagout
The Hazardous Energy Control – Lockout/Tagout Program is designed to prevent injuries resulting from unexpected start-up, energization or release of stored energy during servicing and maintenance of...
Planning for high risk activities
EH&S has new and updated tools for UW units to help protect staff engaging in high risk activities:
Lockout/Tagout (LOTO) Procedure
Confined Space Evaluation
Fall Protection Work Plan
Job Hazard...
Personal Protective Equipment (PPE)
The purpose of the personal P\protective equipment (PPE) program is to protect researchers, employees, students, and visitors from potential hazards in the work environment. However, eliminating...
Shop and Maker Space Safety
Shop and maker space safety is a critical part of an accident prevention program. Employees, students and visitors may be exposed to hazardous machinery, physical hazards, hazardous materials or...
Spill Response Poster
Use the Spill Response Poster as a guide to clean up radiological, chemical and biohazardous spills.
Post in your lab alongside the Exposure Response Poster.