Planning for high risk activities
EH&S has new and updated tools for UW units to help protect staff engaging in high risk activities:
Lockout/Tagout (LOTO) Procedure
Confined Space Evaluation
Fall Protection Work Plan
Job Hazard...
Personal Protective Equipment (PPE)
The purpose of the personal protective equipment (PPE) program is to protect researchers, employees, students, and visitors from potential hazards in the work environment. However, eliminating...
Animal Use Medical Screening (AUMS)
The animal use health screening program evaluates and addresses potential health risks related to working with research animals. It is offered to all University faculty, staff, and students who...
Asbestos and Other Regulated Building Materials
Building materials can contain a number of hazardous components that, if disturbed, can pose a health risk to workers and occupants.
Regulated building materials pose no health risk when left alone...
Basic Electrical Safety
We rely on electricity, but sometimes underestimate its capability of causing injury. Even household current (120 volts) can stop your heart. UW personnel need to be aware of the hazards...
Hazardous Energy Control - Lockout/Tagout
The Hazardous Energy Control – Lockout/Tagout Program is designed to prevent injuries resulting from unexpected start-up, energization or release of stored energy during servicing and maintenance of...
Shop Safety Audit and Inspection Explanations
EH&S has recently updated our inspection checklist and how we conduct shop inspections. As of March 2021, EH&S is now using the Safety Stratus inspection software to provide better...
Hot Work
Hot work operations can be dangerous, especially in areas where flammable or combustible materials are present. According to the National Fire Protection Association (NFPA), U.S. fire departments...