Skip to main content
UW Environmental Health & Safety
  • About
  • Emergencies
  • Report
  • Training
  • Waste
  • Biological
    • Biohazardous Waste
    • Biological Research Approval
    • Biological Research Safety
    • Biological Safety Cabinets
    • Bloodborne Pathogens
    • Select Agent Program
    • Sharps and Lab Glass Waste
    • Viral Vectors for Gene Transfer
  • Chemical
    • Container Labels
    • Compressed Gases and Cryogens
    • Fume Hoods
    • Hazard Communication
    • MyChem
    • Safety Data Sheets (SDSs)
    • Shipping Hazardous Materials
    • SOPs
    • Specific Chemical Hazards
    • Spills in Labs
    • Treatment and Recycling
    • Waste
  • Environmental
    • Air Permit
    • Air Quality Indoors
    • Campus Events
    • Disaster Response (PEAT)
    • Heat Exposure
    • Pests and Wildlife
    • Smoking and Vaping
    • Soil and Groundwater
    • Stormwater
    • Wastewater
    • Water Quality
    • Wildfire Smoke
  • Fire & Life
    • Automated External Defibrillators
    • Campus Fires
    • Capital Safety Projects
    • Electrical Safety
    • Emergency Procedures
    • Evacuations and Fire Drills
    • Event Permits
    • Facilities Projects Support
    • Fire Code Compliance
    • Fire Safety
    • Hot Work
  • Radiation
    • Control of Radioactive Materials
    • Dosimetry
    • Laser Safety
    • Medical Use of Radioactive Materials
    • MRI Medical Screening
    • Non-Ionizing Radiation Safety
    • Personnel Monitoring
    • Radiation Detection Instrument Calibration
    • Radiation Exposure During Pregnancy
    • Radiation Producing Devices
    • Radiation Safety Committee
    • Radiation Use Authorization (RUA)
    • Radioactive Material Shipment Request
    • Radioactive Waste Management
    • Radiological Contamination Surveys
    • Use of Radiation in Human Subjects Research
    • UW Research & Training Building Remediation
  • Research & Lab
    • Animal Use Medical Screening
    • Boating Safety
    • Caution and Warning Signs
    • Diving Safety Program
    • Field Operations Safety
    • Laboratory Safety
    • Pressure Vessels
    • Research Occupational Health
    • Sharps Safety
    • Surveys and Inspections
  • Workplace
    • Accident Prevention Plan
    • Confined Spaces
    • Cranes, Hoists and Rigging
    • Employee Health Center
    • Ergonomics
    • Emergency Washing Equipment
    • Fall Protection
    • Food Safety
    • Health and Safety Committees
    • Hearing Loss Prevention
    • Incident Reporting
    • Job Hazard Analysis
    • Lockout/Tagout
    • Personal Protective Equipment (PPE)
    • Respiratory Protection
    • Regulated Building Materials
    • Shops and Maker Spaces

Search

Responsive Main menu

  • Home
    • Biological
      • Biohazardous Waste
      • Biological Research Approval
      • Biological Research Safety
      • Biological Safety Cabinets
      • Bloodborne Pathogens
      • Select Agent Program
      • Sharps and Lab Glass Waste
      • Viral Vectors for Gene Transfer
    • Chemical
      • Container Labels
      • Compressed Gases and Cryogens
      • Fume Hoods
      • Hazard Communication
      • MyChem
      • Safety Data Sheets (SDSs)
      • Shipping Hazardous Materials
      • SOPs
      • Specific Chemical Hazards
      • Spills in Labs
      • Treatment and Recycling
      • Waste
    • Environmental
      • Air Permit
      • Air Quality Indoors
      • Campus Events
      • Disaster Response (PEAT)
      • Heat Exposure
      • Pests and Wildlife
      • Smoking and Vaping
      • Soil and Groundwater
      • Stormwater
      • Wastewater
      • Water Quality
      • Wildfire Smoke
    • Fire & Life
      • Automated External Defibrillators
      • Campus Fires
      • Capital Safety Projects
      • Electrical Safety
      • Emergency Procedures
      • Evacuations and Fire Drills
      • Event Permits
      • Facilities Projects Support
      • Fire Code Compliance
      • Fire Safety
      • Hot Work
    • Radiation
      • Control of Radioactive Materials
      • Dosimetry
      • Laser Safety
      • Medical Use of Radioactive Materials
      • MRI Medical Screening
      • Non-Ionizing Radiation Safety
      • Personnel Monitoring
      • Radiation Detection Instrument Calibration
      • Radiation Exposure During Pregnancy
      • Radiation Producing Devices
      • Radiation Safety Committee
      • Radiation Use Authorization (RUA)
      • Radioactive Material Shipment Request
      • Radioactive Waste Management
      • Radiological Contamination Surveys
      • Use of Radiation in Human Subjects Research
      • UW Research & Training Building Remediation
    • Research & Lab
      • Animal Use Medical Screening
      • Boating Safety
      • Caution and Warning Signs
      • Diving Safety Program
      • Field Operations Safety
      • Laboratory Safety
      • Pressure Vessels
      • Research Occupational Health
      • Sharps Safety
      • Surveys and Inspections
    • Workplace
      • Accident Prevention Plan
      • Confined Spaces
      • Cranes, Hoists and Rigging
      • Employee Health Center
      • Ergonomics
      • Emergency Washing Equipment
      • Fall Protection
      • Food Safety
      • Health and Safety Committees
      • Hearing Loss Prevention
      • Incident Reporting
      • Job Hazard Analysis
      • Lockout/Tagout
      • Personal Protective Equipment (PPE)
      • Respiratory Protection
      • Regulated Building Materials
      • Shops and Maker Spaces
  • Home
  • Search
  • All
  • Programs
  • Resources

UW Seattle Stormwater Operations and Maintenance Plan

UW Seattle Stormwater Operations and Maintenance Plan
387.90KB (.pdf)
  The UW Seattle Stormwater Operations and Maintenance Plan details procedures for protecting storm water quality on the Seattle campus. Read more about stormwater management on the…

UW Biohazard Waste Flow Chart: Life Sciences Building

UW Biohazard Waste Flow Chart: Life Sciences Building
255.48KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous waste at the UW Life Sciences Building (LSB) location.

Evacuation Plan for Individuals with Disabilities

Evacuation Plan for Individuals with Disabilities
72.81KB (.docx)
 Individuals with disabilities are invited to complete an evacuation plan using the template provided and provide it to the University building evacuation director or building coordinator. 

IBC Project Review Flowchart

IBC Project Review Flowchart
278.34KB (.pdf)
  The IBC Project Review Flowchart illustrates the Biological Use Authorization (BUA) approval process for projects with biohazards.  

Fall Protection Work Plan

Fall Protection Work Plan
188.42KB (.docx)
 The UW requires a Fall Protection Work Plan when working at heights. It must be posted at the worksite for the duration of work activities. Use the Fall Protection Work Plan…

Fieldwork Safety Plan Template 1

Fieldwork Safety Plan Template 1
539.80KB (.docx)
 The Fieldwork Safety Plan Template 1  may be used by the principal investigator (PI), responsible party (RP), field instructor, or safety officer to develop a Safety Plan. The completed…

PCB Caulking Work Plan for UW Seattle

PCB Caulking Work Plan for UW Seattle
319.54KB (.pdf)
  The PBC Caulking Work Plan provides University of Washington with the steps for the removal and disposal of Polychlorinated Biphenyls (PCB)-containing window caulking and glazing compound…

UW Bothell and Cascadia College Stormwater Operations and Maintenance Plan

UW Bothell and Cascadia College Stormwater Operations and Maintenance Plan
484.35KB (.pdf)
  The Stormwater Operations and Maintenance Plan for UW Bothell and Cascadia College details procedures for protecting storm water quality on the UW Bothell and Cascadia College campuses. Read…

UW Bothell Cascadia College Stormwater Management Program

UW Bothell Cascadia College Stormwater Management Program
222.28KB (.pdf)
  The UW Bothell Cascadia College Stormwater Management Program describes stormwater management for the UW Bothell campus. Read more about stormwater management on the Stormwater…

First Aid Plan Guidelines

First Aid Plan Guidelines
1.46MB (.docx)
 All University personnel must have access to quick and effective first aid in the event of an emergency. The First Aid Plan Guidelines contain instructions for creating a First Aid Plan…

UW Asbestos Management Plan

UW Asbestos Management Plan
140.69KB (.pdf)
The Asbestos Management Plan (AMP) establishes policy and procedures to manage asbestos and ensure compliance with applicable federal, state and local regulations. The compliance procedures outlined…

Fire Department Event Permit Flowchart

Fire Department Event Permit Flowchart
701.72KB (.pdf)
  Review the Fire Department Event Permit Flowchart to determine whether you need a permit from your local fire department. Visit the Fire Department Permits for Events webpage for more…

UW Biohazard Waste Flow Chart: Animal Research

UW Biohazard Waste Flow Chart: Animal Research
177.10KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous animal research waste.

UW Biohazard Waste Flow Chart: University of Washington Medical Center

UW Biohazard Waste Flow Chart: University of Washington Medical Center
236.39KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous waste within the UW Medicine University of Washington Medical Center.

UW Biohazard Waste Flow Chart: WaNPRC

UW Biohazard Waste Flow Chart: WaNPRC
531.32KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous waste within the Washington National Primate Research Center (WaNPRC).

UW Biohazard Waste Flow Chart: South Lake Union

UW Biohazard Waste Flow Chart: South Lake Union
252.59KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous waste at the UW South Lake Union (SLU) location.

UW Biohazard Waste Flow Chart: Main Campus and Leased Facilities

UW Biohazard Waste Flow Chart: Main Campus and Leased Facilities
221.37KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous waste on the UW Seattle campus and leased facilities. Please note this flow chart does not apply to the Magnuson Health…

UW Biohazard Waste Flow Chart: Magnuson Health Sciences Center

UW Biohazard Waste Flow Chart: Magnuson Health Sciences Center
230.80KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous waste at the Magnuson Health Sciences Center.

UW Biohazard Waste Flow Chart: Harborview Research & Training Building

UW Biohazard Waste Flow Chart: Harborview Research & Training Building
247.36KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous waste at the Harborview Research & Training Building.

UW Biohazard Waste Flow Chart: Harborview Medical Center

UW Biohazard Waste Flow Chart: Harborview Medical Center
227.49KB (.pdf)
This flow chart shows the waste stream for different types of biohazardous waste at Harborview Medical Center.

Pagination

  • Current page 1
  • Page 2
  • Next page Next ›
  • Last page Last »

Sort by

  • Alphabetical
  • Relevance
  • Featured
  • Last Updated

Category

  • Biological Safety (11)
  • Chemical Safety (1)
  • Environmental Health (5)
  • Fire & Life Safety (1)
  • Occupational Safety & Health (1)
  • Radiation Safety (1)
  • Research & Lab Safety (4)
  • Workplace Safety (9)

Resource type

  • Focus/Fact Sheet (174)
  • Form (76)
  • SOPs (54)
  • Guidelines (53)
  • Poster/Sign (36)
  • Checklist (32)
  • Report (30)
  • Agenda (28)
  • Template (26)
  • Manual (19)
  • Instructions/FAQs (17)
  • Labels (15)
  • Tool (15)
  • Policies/Procedures (14)
  • Log (9)
  • Publication (9)
  • Presentation (8)
  • List (7)
  • Alert (5)
  • Notification (4)
  • charter (3)
  • Map (2)
  • Organization Chart (1)
  • Roster (1)
  • (-) Plan (17)
  • (-) Flowchart (16)
University of Washington

Be boundless

Footer

  • Accessibility
  • Contact Us
  • Campus Safety
  • Terms
  • EHS Login

© 2025 UW Environmental Health & Safety | Seattle, WA | 206.543.7262 | ehsdept@uw.edu