Planning for high risk activities
EH&S has new and updated tools for UW units to help protect staff engaging in high risk activities:
Lockout/Tagout (LOTO) Procedure
Confined Space Evaluation
Fall Protection Work Plan
Job Hazard...
Chemical Waste Guide for UW Facilities
This guide contains instructions for a list of specific shop-related wastes as well as general guidance for spills and disposal.
This guide was written for shops operated by UW Facilities. Other...
Personal Protective Equipment (PPE)
The purpose of the personal protective equipment (PPE) program is to protect researchers, employees, students, and visitors from potential hazards in the work environment. However, eliminating...
Asbestos and Other Regulated Building Materials
Building materials can contain a number of hazardous components that, if disturbed, can pose a health risk to workers and occupants.
Regulated building materials pose no health risk when left alone...
Fire & Life Safety Survey Explanations
Administration
Housekeeping
Storage & Seismic Safety
Electrical
Exiting
Doors, Walls...
Hazardous Materials
Compressed Gases
Fire Extinguishers
Emergency Wash Equipment..
Fire Protection/...
Basic Electrical Safety
We rely on electricity, but sometimes underestimate its capability of causing injury. Even household current (120 volts) can stop your heart. UW personnel need to be aware of the hazards...
UW LOTO Field Procedure
For equipment and systems that are not routinely repaired or serviced, or require partial shutdowns, and where change management of practices are not robust, then the UW LOTO Field Procedure form...
Hazardous Energy Control - Lockout/Tagout
Updated June 27, 2022
The UW Hazardous Energy Control Lockout/Tagout (LOTO) Program was developed to prevent personal injury or illness resulting from unexpected start-up, energization or release of...
UW LOTO Procedure
For equipment that is routinely maintained and serviced, requires a full shutdown for servicing, and has good change management practices in place, the UW LOTO Procedure form can be used.
Refer to...
Department Supplemental Hazardous Energy Control LOTO Program Template (added June 2022)
The Supplemental Hazardous Energy Control LOTO Program Template (Word) and addresses department-specific hazards and safety guidance for controlling hazardous energy when repairing or servicing...
Lockout/Tagout Authorized Person(s) Periodic Review (added June 2022)
The Authorized Person(s) Periodic Review (Word) is used to inspect the Authorized Person’s role and responsibility established in the hazardous energy control program and confirm that the...
LOTO Lock Removal Form (updated June 2022)
The LOTO Lock Removal Form (Word) includes directions and specific information a department or unit must document when an Authorized Person (lock owner) is unable or unavailable to remove their...
Shop Safety Audit and Inspection Explanations
EH&S has recently updated our inspection checklist and how we conduct shop inspections. As of March 2021, EH&S is now using the Safety Stratus inspection software to provide better...
Hot Work
Hot work operations can be dangerous, especially in areas where flammable or combustible materials are present. According to the National Fire Protection Association (NFPA), U.S. fire departments...